Hotel Zlatni Lav and its restaurant building in Martinšćica

Private investment opportunity · Martinšćica, island of Cres

31 keys today. A clear path toward approximately 90—without buying another metre of land.

Hotel Zlatni Lav is an operating four-star hotel on 5,823 m² in Martinšćica, Cres. The property includes the hotel, restaurant, wellness centre, conference space, staff accommodation and the land for its first expansion phase.

4-staroperating hotel
31existing keys
5,823 m²owned cadastral land
3,670.83 m²gross built area
≈90development concept on owned land

The property today

Hotel, restaurant, wellness and staff accommodation—already in place.

The hotel operates above Martinšćica Bay with 31 guest units, a professional restaurant kitchen, indoor wellness pool, treatment rooms, a 50-seat conference room and dedicated staff accommodation.

After nearly 20 years of ownership, the current owner is retiring and is prepared to support an orderly handover.

View across the hotel grounds toward the Adriatic Sea
Martinšćica · Island of Cres
01

Hotel

31 existing keys across rooms, suites and apartments, many with sea or garden views.

02

Restaurant

Large covered and open terraces, dining room and a fully equipped professional kitchen.

03

Wellness

Indoor heated pool and treatment rooms, with more wellness capacity than the current 31-key hotel requires.

04

Groups

A 50-seat conference room and an established relationship with organised coach and agency groups.

05

Staff accommodation

A dedicated staff building plus management and residential accommodation within the property.

06

Grounds

Landscaped Mediterranean gardens, internal access and a short walk to the coast.

Development on owned land

The first expansion phase is already inside the property boundary.

The three cadastral parcels included in the transaction allow the room count to grow while the restaurant, wellness centre, conference space and operating infrastructure remain in place.

01

Third accommodation building

Foundations are in place and a residential building permit exists on the owned T1-1 area. A new project can convert the site to accommodation and add roughly 30 rooms.

02

Additional floors and reconfiguration

Reconstruction, additional floors and internal reconfiguration can add rooms and repurpose the current residential level. The final room mix depends on the selected design.

03

Expanded staff accommodation

The low-rise staff building can be expanded for additional staff housing or other hotel services.

04

Optional second expansion phase

Nearby T1 land can be acquired separately for a later phase. It is not included in the sale and is not required for the approximately 90-key owned-property concept.

Planning context

Owned land and expansion areas on the adopted plan.

The map overlays the adopted UPU land-use plan on the cadastral base. It distinguishes the 5,823 m² included in the transaction from separately purchasable neighbouring land and public planning areas.

Owned propertySeparate expansion landPlanning context

The investment logic

The restaurant, wellness centre and conference room already exist. More keys put them to work.

At 31 keys, the existing facilities have capacity to spare. A larger hotel creates its own guest base for meals, wellness and organised groups while using infrastructure that is already built.

Historic Lubenice village above the Adriatic SeaEvening at the Adriatic coast

Cres · Croatia

A quiet base for exploring both Cres and Lošinj.

Martinšćica combines sea views, beaches and a calm island setting. The hotel sits between the towns of Cres and Mali Lošinj, giving guests a practical base for summer holidays, groups, active travel and longer shoulder-season stays.

  • Very safe, calm island environment
  • Established April–October hotel season
  • Beaches, hiking, cycling, diving and nature
  • Central position for exploring both Cres and Lošinj

Local execution

More than a handover.

The seller’s family brings nearly 20 years of hotel experience. Geo-Teo, the only registered land-surveying company based on Cres, can coordinate the technical path from acquisition to permits and construction through an established local network.

01

Cadastral and planning coordination

02

Permit and project-application coordination

03

Architect, engineer and contractor network

04

Landowner and infrastructure coordination

Acquire it. Control it. Or finance the next phase.

The preferred route is a full acquisition. Majority investment and secured structured capital can also be discussed, with governance, economics and exit terms agreed in advance.

01

Full acquisition

Acquire the entire hotel business and owned real estate, with an agreed handover if required.

02

Majority investment

Investor control, clear governance and a defined path for the existing owners to exit.

03

Structured capital

Secured refinancing and development capital, with return and exit terms agreed upfront.

Hotel Zlatni Lav and restaurant illuminated at night

Next step

Visit the hotel. Review the plans. Run the numbers.

After an initial conversation, interested buyers and investors can receive the detailed property schedule, official appraisal measurements, planning materials and financial information.

Contact the owner’s representativePrice and transaction terms are available on request.